How to Prepare Wiring and Electrical In Insulspan SIPs
Loading...
10,827
Loading...
Uploader Comments (graphica54)
see all
All Comments (3)
-
How do you pipe a commerical building per NEC code?
-
At 6:00 didn't you violate the NEC rules on minimum bend radius for conductors by "doubling" it through that hole?
Loading...
What about drywall nails and screws going throught the electricians wire>>????
george6900 2 years ago
Because the wire chases are centered in the panel, the wires run out of range of any screws that would be used to apply finish materials. For example, if there is a 4.5 panel wall thickness, the wires run in the center channel that is approximately 2 ¾ inches in from the surface of the panel. With a maximum 1 ½ inch drywall screw, it leaves you ¾ inch safe zone for your wires. For more information please contact us at 800.PANEL.10