Upload

Loading icon Loading...

This video is unavailable.

US 290/Beltway 8 Interchange Animation

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like TxDOT's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike TxDOT's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add TxDOT's video to your playlist.

Uploaded on Oct 8, 2009

This animation video shows the concept for the proposed US 290/Beltway 8 interchange after the proposed US 290 Program improvements are complete. Highlighted in the video are Collector Distributor ramps which will allow motorists easier access to FM 529, Senate Avenue and West Little York; continuous Beltway 8 frontage roads through the interchange; and Direct Connectors between Beltway 8 and the Hempstead Tollway. The existing Direct Connectors between US 290 and Beltway 8 are expected to remain.

  • Category

  • License

    Standard YouTube License

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to