We insulated the exterior side walls with dense packed cellulose, air sealed all the bypasses, insulated the attic to R50, insulated/weather-stripped the attic access, installed soffit ventilation chutes and did a worst case draft test all in one eight hour day.
Link to this comment:
All Comments (0)