Upload

Loading icon Loading...

This video is unavailable.

#8 Windsor Family Aquatic Complex Construction Update

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like cityofwindsor's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike cityofwindsor's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add cityofwindsor's video to your playlist.

Published on Dec 20, 2012

It took four shipping containers, one big boat and one long truck to get it here from Italy, but the 71-metre competitive pool is now installed in the Family Aquatic Complex. The structure includes thousands of stainless steel walls and buttresses bound together with 30,000 bolts and nuts.

"The pool took about four weeks to install, and we are now working on the plumbing and other mechanical/electrical work," said Don Sadler, Project Manager. "And no, there is no water in it yet: That is the last part of the puzzle."

The competitive pool and diving area will be open for the International Children's Games in August 2013. Work is continuing on budget and on schedule with the official opening of the entire 144,000-square-foot complex scheduled for December 2013.

For the latest updates, visit www.citywindsor.ca or "Like" us on facebook at www.facebook.com/CityOfWindsor.

  • Category

  • License

    Standard YouTube License

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to