Great work, I think bigger the engine, better to work on. Cat in one of the best diesel engines in the world. The biggest one I worked on is the 3406 for trucks and construction equipment. Wll look at website for more videos like this, Thanks for sharing.
@tpvalley the charge air inlet is connected in a horizontal plane at the rear of the head. fastening of the charge air inlet is done via an o-ring, not exactly 'push-fit' but a flat face seal created when the head is tensioned.
for sure.... i worked for MaK for yrs, to fit 9 heads, all pipes, all rockers, tappets set and ready to run took 4.5hrs... (well it was a friday, and the pub was about to open)
wtf they do all with electronic shits,
i would like to see how i worked and i make them work at same conditions it takes about 2 weeks just to open 8 cylinders
igorzimacov 1 week ago
Damn look at how thick that wrist pin is 8:36 !!
Bamchucknorris 3 months ago
Great work, I think bigger the engine, better to work on. Cat in one of the best diesel engines in the world. The biggest one I worked on is the 3406 for trucks and construction equipment. Wll look at website for more videos like this, Thanks for sharing.
64jorthom 4 months ago
I wonder how easy that is to do on an engine that is 10 years old....
Still very interesting!
Lucianrider 7 months ago
I love these type instructional videos,,very informative and educational. People dont realize how big this stuff is . Thanks for sharing this.
vetttech1999 7 months ago 2
Isn't the "media guide" as the call it in this video actually what carries the cooling water between the cylinders?
douro20 8 months ago
he likes to fiddle with his nuts lol.
24nov67 9 months ago
@tpvalley the charge air inlet is connected in a horizontal plane at the rear of the head. fastening of the charge air inlet is done via an o-ring, not exactly 'push-fit' but a flat face seal created when the head is tensioned.
julianmead 9 months ago
@julianmead
does the intake manifold just push fit as he didnt undo it?!
tpvalley 9 months ago
for sure.... i worked for MaK for yrs, to fit 9 heads, all pipes, all rockers, tappets set and ready to run took 4.5hrs... (well it was a friday, and the pub was about to open)
julianmead 11 months ago