Foamers, Signal Problems, and the First Rerouted Double Stacks of the Season
Uploader Comments (C60AC)
All Comments (29)
-
Very nice footage. Now THAT's railroading! Re-routes are always great, and the scenery of Utah is hard to beat. Awesome package. Definitely subbing to your channel. ;-)
-
Whatever
-
No. A lot of BNSFs changed their schedules and running days. It took a little time for things to really get on a "regular schedule".
-
So???? stuff was about the same a month ago
-
Back then only the MNPRV and an occasional BNSF was running. Now there are two UP manifests, three of four BNSfs, and some grain/repo action.They canyon is defiantly necessary with how Donner can be slow/unreliable. But that comment was from a month ago.
-
What are you talking about, the canyon is about the same, you have the MNPRVs, the BNSFs, and the occasional grain train, traffic is about the same (slightly slower) but UP still considers the canyon necessary, if they didn't, they wouldn't be running trains over it.
-
They thought so. UP said they wanted to switch all westbound grain, manifest, and extra traffic to FRC. But really none of that has. All FRC has now is the MNPRV(B). So they're expecting it to. Hopefully it will. I want to get back up but it will probably be a bust with only 1 or 2 trains a day.
Great Vid ! I thought Donner went down to single track years ago . The second rail removed to cut costs? Is it now double track again ?
gringo4x4do 1 year ago
@gringo4x4do It has been double for as long as I can remember except for one short distance (west of Emigrant Gap? I want to say?) And that was supposedly double tracked last November when UP did the tunnel notching.
C60AC 1 year ago
Outstanding, been waiting for more of your videos.
spacecalander 2 years ago
Thanks!!
C60AC 2 years ago
awesome scenery!! 5 stars!
Jeffwecker81 2 years ago
Thanks!
C60AC 2 years ago