28th May 2007. The Duke's record breaking run to Plymouth seen from the train as it tears along Teignmouth Seawall then inland along the Teign Estuary. The clip ends as we pass under the A380 on the approach to Newton Abbott. At times it was difficult to keep a footing in the swaying carriage. There was the additional hazard of being swatted by overgrown branches brought down by the previous day's gale.
Link to this comment:
All Comments (0)