Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

ASI Construction July time lapse

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
444 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 18, 2011

Construction on the Nelson Cultural Center, a 34,000 square foot addition to the American Swedish Institute in Minneapolis, Minn., began in late May 2011 and is scheduled to be complete by June 2012. This is a time lapse video from the month of July 2011, made with images captured once every 15 minutes by the construction camera. The Nelson Cultural Center was designed by HGA Architects and Engineers; Adolfson & Peterson is the general contractor for the project. For more information, visit: http://www.americanswedishinst.org/ASI/Campus_Expansion.html

Category:

Nonprofits & Activism

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more