Masonry

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
11,778
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 10, 2010

Stress free Block Laying!!

Category:

Howto & Style

Tags:

License:

Standard YouTube License

  • likes, 2 dislikes

Link to this comment:

Share to:
see all

All Comments (31)

Sign In or Sign Up now to post a comment!
  • You might as well take that line down. Why the hell you have that level out when your laying to the line? Wrong!

  • Why does he pat the trowel on the board when its loaded? What is the purpose of putting the morter so much farther ahead of the block your actually laying? Thanks

  • i'd say 2 blocks a minute is good enough. but 7 in 7 minutes is a little slow. but whatever, everyones got there own pace when theyre bein perfect

  • Im interested to know how would you guys finish the internal wall of these blocks? In the UK we would either wet plaster the walls or we would dot and dab drywall onto the blockwork then give the drywall a skim coat of plaster.

  • poor level he got called in on a day he wasnt needed!

  • DONT BE SO CRITICAL OF ANOTHER MANS WORK!! when your the boss, you can take your time, use any tool it takes to insure an accurate / clean job!!! Ive seen some of work you speed demons do, and it normally looks like crap up close!!! TAKE your time, enjoy what your doing, and at the end of the day what matters, is a happy customer!!!! That if you ever meet the customer, some of you only collect a paycheck, and never meet the client. OH by the way, ITS TITLED "STRESS FREE BLOCK LAYING"

  • @spiegelsteven haha omg your so right right now im doing an apprenticeship and our crew 3 guys including me go 10 times as fast and just as good we lays 1000 blocks each in 10 hours , hahaha and whats with the laborer walking and doing the shovel shuffle save your steps eh move the wheel barrow right up to a zone load half and move it unload the other half move some blocks then mix another batch haha

  • Why the hell is this guy facing his block up with a 4 ft level when he is running to the line. I could have built 4 courses in the time this boot layed 1 . And to all the people who say speed isnt everything tell your fucking boss that shit. You better lay em fast and lay em right wnen you work for me. Im not saying kill yourself but this guy would be gone down the road as soon as he pulled that level out while beating a fucking line.

  • I dont understand wy you guys dont use a solid block like we do in England it would save on rebar and concrete.

  • i thought pro masons only level one side of a blockwall,do to the irregularaties in the block,i once got fired for checking both sides of a block wall overall good tho!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more