Thanks once again to the amazing team at Uretek USA for this video which shows the Uretek Method for concrete panel replacement and Re-leveling.
Note that this method allows the re-use of the pavement about 8 hours after commencement of work, ensuring that aircraft schedules can be maintained, or that roads can be made available to traffic in the shortest possible time.