Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Norochcholai coal power plant IESL field Visit 2011 1

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
54 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 21, 2011

No description available.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (hasalaid)

  • A comprehensive tour of the plant including each sub unit was conducted. I wouldn't say that the work is upto EU or US standard. There were issues where low quality equipment not suitable for the salty environment being used for non-essential components. u were correct in assuming a high cost since they buy at 130 USD per ton and dividing it by 2.5 , we get a rough fuel cost about 7 Rs. The capital cost being 2.5 Rs/Kwh will give a total generated kWh cost of about 10 Rs/KWh

see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • Was you all not allowed inside the plant? This confirms the press report that school children are not allowed inside the power plant and they are taken around in a bus for there safety and a video show is only shown of the plant. Is it such a risky plant now not to allow visitors inside the plant with all sorts of Leaks steam water Electricity and may be polluting and non polluting items as well.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more