Simultaneous Auguring

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
6,276
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 1, 2009

http://www.gikenamerica.com
Simultaneous Auguring is performed in areas where difficult soils are encountered. Because the fully encased auger is installed at the same time as the sheet pile, the soil is partly sheared by the advancing sheet pile (as pairs) and the passive condition of the soils are nearly unchanged.

With the Simultaneous Auguring system, this method of sheet pile installation is desirable in areas where the N-Values reach from 40 BPF ~ 100 BPF and beyond refusal.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more