ALE HeavyLift

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
6,171
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 3, 2008

One of three 180 tonne tranformers on route from ThamesPort, Isle of Grain to the new Grain Power Station, Isle of Grain. The gross weight of the whole combination is approx. 290 tons. The transformer was moved on a 22 axle Scheuele SPMT. A 12 axle line was connected next to 10 axle lines and power pack. The journey from the port to site of only 1.8 miles took an hour and thirty minutes. Due to the size of the load, a particular stretch of road had to be completly closed for approx 50 minutes with police and coucil permission but without police or council assistance and much to the anger of the local residents of the village of Grain, as the stretch of road was the only way in and out of the village. The load was moved during daylight because the electricity board had to isolate then lift an overhead cable which was not allowed to be done at night. Once unloaded, the SMPT had to be moved back to ThamesPort for the next transformer. The load was escorted by Teahan Abnormal Load Escort Services.

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more