Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Round and Round

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
534 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 19, 2011

Airfix Castle from the 70's pulling Bachmann Mk1s fitted with Hornby R8220 couplings, plus Dapol County fitted with Airfix tender drive pulling Hornby Hawksworth Coaches with modified couplings and replacement corridor connectors. Layout control using Gaugemaster DS and P Controllers. Track is Peco Streamline electrofrog points and 3ft minimum radius. For more pictures go to http://www.flickr.com/photos/longsheds/collections/72157609823068107/

Category:

Howto & Style

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (longsheds)

  • It has taken some some time and is cheaper than going on holidays or buying a round of drinks each night.

  • Great video, how many class 20s do u have?

  • @Englishsam321 Glad you like the video, in answer to your question, two, D8000 and a newer model with the sound and decoder removed.

see all

All Comments (5)

Sign In or Sign Up now to post a comment!
  • That is an incredible layout! Wish I had something even half the size of that! Must have cost the world though!

  • Awesome

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more