Mader Stublić Wiermann: draft for the Chelsea Art Museum. A layer of vertical LED-rods is installed on the façade of the Chelsea Art Museum, with a gap in between the building and the new structure. The LED structure will surpass the height of the building, to be in line with the taller buildings immediately surrounding the Museum. The material used for the new façade is extremely thin and it will appear as a transparent shell covering the building.
Link to this comment:
All Comments (0)