Superior Walls 1.MOV

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,311
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Feb 25, 2010

www.thehootsgroup.com
We are now putting the foundation walls in place at the Midtown Green House. These walls were built off site and we being fabricated while we were getting the inspections from the city. This system not only saves us on time. Notice the details on the walls- we do not have to add insulation or frame on the basement level since these components are built into place already.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more