Thiess John Holland undertakes a large overnight concrete pour at the Kalinga Park worksite for construction of the base slab for the Tunnel Boring Machine launch box. Two TBMs will be launched here to excavate Brisbane's Airport Link tunnel in mid 2010.
Link to this comment:
All Comments (0)