NorthStar Blow-in-Blanket System Installation

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
2,605
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 1, 2010

Video from an on-site insulation installation in 2009. Shows the BIBS process, from stapling fabric to filling the cavity full at the proper density

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (NorthStarComfort)

  • As long as it's installed correctly, there's no need to roll it. It's just blow & move on, unless a vapor retarder needs to be put up before drywall.

  • The fabric is stretched out and stapled while taut on both sides of every cavity.

see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • you don't need to roll it after you're done blowing?

  • do you have some sort of stretcher for the webbing? we dont we staple up the lip on both sides of the stud so it tightens and prevents from blowing over the studs.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more