Featured Playlists
The Fast Lane Series
Once the new layout came about, it was time to focus in on operating patterns. About that came the idea for The Fast Lane with lots of trains and multiple movements. Once the new layout's trackage expanded enough the new layout was soon double tracked to allow two trains running simultaniously, hence the name Fast Lane. This layout also goes through lots of changes including two additions to the actual foundation. However new ideas may bring the Fast Lane to an end and begin new beginnings as open-grid construction may come about in the coming months.
Advertisement





Play all(636)








