Uploaded videos
1-10 of 45-
MassDOT 93Fast14 Bridge Replacement Project
ssdphoto
762 views
Under the direction of MassDOT the most ambitious highway replacement project to date took place during the Summer of 2011 along I-93 in the town of Medford, Massachusetts ...
-
Barletta Nears Completion of Boston's North Bank Bridge
ssdphoto
1,384 views
During the early morning hours of October 3rd, 2011 Barletta Heavy Division assembled the three final superstructure segments of the North Bank Pedestrian Bridge in Boston,...
-
93FAST14 Bridge Demolition
ssdphoto
2,594 views
During the Summer of 2011 MassDOT embarked on an ambitious interstate bridge replacement project that has set the standard for highway infrastructure upgrades for years to ...
-
Building the Chelsea Street Bridge - Sheave Lift
ssdphoto
8,569 views
J.F. White Contracting Co. out of Framingham, MA is the lead contractor on the $125-million Chelsea Street Bridge replacement project in East Boston, MA.
The 450 feet span...
-
Equipment Express Heavy Haul in NY
ssdphoto
1,344 views
I just got off the NewYork State thruway on I-90 at exit 48A when a State Trooper pulled in front of me blocking my path to let this beast roll onto the highway.
I grabbe...
-
Old Giants Stadium Gets Filled In - Moving the Earth
ssdphoto
3,437 views
Gramercy Group, Inc. (www.gramercygroupinc.com) was the lead demolition contractor that brought Giants Stadium to the ground in less than 5 months.
After the last standing...
-
Old Giants Stadium Gets Paved Over
ssdphoto
2,492 views
Gramercy Group Inc. finished primary demolition of Giants Stadium on June 27th, 2010 and began filling in the bowl with 250,000 cubic yards of reclaimed soil.
A 2 foot t...
-
Reeving the Block
ssdphoto
5,049 views
Local 7 Ironworkers and Hallamore Crane Operations Crew reeve the block of a Demag AC 600-ton telescoping crane from left to right with 24 mm CASAR cable and 1,804 feet of...
-
Chelsea Street Bridge - South Tower Crane Lift
ssdphoto
2,525 views
J.F White Contracting comes one step closer to the completion of the new Chelsea Street Bridge with the addition of the East upper leg portion of the South Tower.
Crews ...
-
The American Ironworker
ssdphoto
10,995 views
Local 7 Ironworkers out of South Boston, MA have toiled since February 2010 to build the support towers of a unique center span lift bridge over the Chelsea River between C...
Advertisement










Play all(45)