Uploaded videos
1-10 of 141-
Millers Happy Hour 3-2-2012
skimmeroutdoors
20 views
George and Al celebrate the finishing of the 1979 23 Mako project at Babylon Boat Works
-
Final Sanding of the console on the1979 23 Mako
skimmeroutdoors
41 views
The final sanding of the console was completed today. Any imperfections were filled with Formular 27 and sanded smooth
-
Special K's day 6 1979 23 Mako
skimmeroutdoors
73 views
After sanding down the areas of the center console that was filled with Cabosil Captain Al blew away any dust and filled any pin holes and small imperfections with Evercote...
-
Special K's Day 6
skimmeroutdoors
68 views
More filling of the no longer needed holes on the 1979 23 Mako center console
-
Special K's Day 5 23 Mako 1979
skimmeroutdoors
73 views
When you need to replace the tank on a 23 Mako you must completely remove the center console to access the tank. While you have the console off you might as well restore it...
-
Special K's Day 4
skimmeroutdoors
119 views
Fuel Tank connections and more on the 23 1979 Mako
-
Repairing the deck on a Mako
skimmeroutdoors
67 views
Original question:
Curious on the floor repair, as my boat has a similar area on the starboard side with rot that I will be attacking.
My plan was to cut through the to...
-
Special K's day 3 1979 Mako 23
skimmeroutdoors
91 views
The tank coffin was prepaid for the new tank in the1979 23 Mako
-
1979 23 Mako "Special K" Tank removal
skimmeroutdoors
168 views
Day 2 on the 1979 23 Mako "Special K"
The crew at Babylon Boat Works removed the old tank from the boat and good thing because the tank had pin hole leaks seeping gag into...
-
1979 23 Mako "Special K" Tank removal
skimmeroutdoors
61 views
Day 2 on the 1979 23 Mako "Special K"
The crew at Babylon Boat Works removed the old tank from the boat and good thing because the tank had pin hole leaks seeping gag into ...
Advertisement










Play all(141)