Uploaded videos
1-10 of 73-
The B-3, short update...mounting the drivers seat, dashboard flange
robbovius
17 views
-
B-3 Status, January 21 2012
robbovius
56 views
Update on the B-3 reverse trike build: fuel system, exhaust header, firewall flange.
-
B-3 status 11-24-11
robbovius
113 views
A bit of expositional videography, detailing the status of the B-3 reverse trike project...
-
Welding in the XS850 Steering head, with VIN.
robbovius
110 views
file under crappy blackberry video...welding in the all important XS850 steering head with the VIN...now its a REAL vehicle ;-)
-
Connecting the Spine
robbovius
39 views
Another grainy blackberry vodeo, show how I connected the rear wheel frame to the driveshaft tunnel, using the two top tubes dissected out of the XS850 frame.
-
The B-3, Various Rollouts Over the Course of the Summer
robbovius
98 views
Rolling the B-3 reverse trike out on a few sunny days over the spring and summer of 2011
-
the B-3, Turning the Rear Wheel with the Starter
robbovius
55 views
after about 13-14 months of construction, I finally made the engine turn the rear wheel! And then I cleaned up all the oil that barfed out of the open oil cooler ports! yay!
-
Installing the intermediate driveshaft!
robbovius
34 views
an incredibly bad video of the intermediate driveshaft, welded and installed in the B-3.
-
building the intermediate driveshaft
robbovius
48 views
another in the stream of grainy Blackberry video updates, in which we see the buildup of the driveshaft tunnel and the intermediate driveshaft, which goes between the engi...
-
Preparing the XS850 engine mount for welding
robbovius
55 views
Another grainy Blackberry video with a small update on progress.
Advertisement










Play all(73)