Uploaded videos
1-10 of 10-
Fuselage Building Part0
rob23062007
555 views
Cabin Floor and Firewall
-
Rudder Building
rob23062007
263 views
Building the rudder in HD
-
Fuselage Building Part1
rob23062007
1,313 views
Fuselage Bottom
-
Elevator and Tailplane
rob23062007
2,818 views
Elevator and Tailplane ready for closing
-
Wing Building
rob23062007
42,296 views
Wing building video
-
Aileron Building
rob23062007
6,515 views
Left-hand aileron of a handbuilt light aircraft including electric trim tab.
-
Flap Building
rob23062007
3,123 views
Assembling the right hand flap of a handbuilt light aircraft.
-
Elevator Building
rob23062007
2,946 views
Assembling the elevator and trim tab of a homebuilt light aircraft. Next the elevator and trim tab drilled are assembled to the tail plane before disassembly for priming
-
Horizontal Stabiliser Building
rob23062007
9,653 views
Assembly of the tail plane of a homebuilt light aircraft. Next the top skin will be drilled, elevator and trim tab drilled and assembled to the horizontal stabiliser before...
-
Rudder Building
rob23062007
6,436 views
First stages of building the rudder of a light aircraft shot in timelapse over 5 hours. Next the rudder will be disassembled, de-burred, cleaned, acid etched, primed, matin...
Advertisement










Play all(10)