Uploaded videos
1-10 of 15-
Snow on the CCRR.MOV
roadrunnerfn
106 views
The CCRR Connies 410 and 411 switching with a snow-plow after having moved a bunch of snow.
-
19092010-02.MOV
roadrunnerfn
102 views
The short worktrain heading back at the Junction to Vallecito (Dam), coming up the line that will once lead to Vallecito (Town).
-
CCRR19092010-01.MOV
roadrunnerfn
93 views
a short run on a flat in front of a worktrain up the new line to the junction.
-
CCRR first regular P-Tr.2010.mov
roadrunnerfn
305 views
The first regular Passenger train on the CCRR in 2010.
Sorry for the bad quality....there are things i have to learn....
-
CCRR long freight the 3rd (and last)
roadrunnerfn
156 views
The pulled-pushed CCRR freight coming up the crossing, this time filmed from the sunny side of the train.
-
CCRR long freight 02
roadrunnerfn
76 views
The CCRR Connies pulling/pushing a 14 cars freight uphill the 4% grade mountainline.
While passing the big crossing near the junction, the train scares away the spider "Hor...
-
CCRR Connies long freight
roadrunnerfn
206 views
The CCRR Connies bringing a long freight up the mountainline
-
CCRR Winter 2010.MOV
roadrunnerfn
372 views
CCRR onboard view through the snow.
The CCRR climbs the 4% incline up to the pass-station trough deep snow and over high bridges.
Die CCRR erklimmt die 4% Steigung zur Pass...
-
CCRR Gardenrailroad Backwards Bridge Through Drive Christmas 09/02
roadrunnerfn
128 views
CCRR Connie with the big plow goes through the 2m Latice Steel Truss Brisge.
www.g-scale-structures.de
-
CCRR Bridge Drive through Christmas 09/01
roadrunnerfn
79 views
CCRR Gardenrailroad
Red Connie goes through the 2m Latice Steel Truss Bridge
www.g-scale-structures.de
Advertisement










Play all(15)