Uploaded videos
1-10 of 52-
Bangor Arena -- 01-26-2012
redbird007
19 views
Seating supports and short vertical walls built offsite have arrived as the framework for the seating bowl begins to take shape. Nearby, a welder works on trusses. Most of ...
-
Bangor Arena -- 01-19-2012
redbird007
25 views
A relatively quiet but frigid day on the construction site as smaller horizontal beams are placed. Across the site, foundation work for the banquet center of the new arena ...
-
Bangor Arena -- 01-12-2012
redbird007
42 views
With the trenches dug for the banquet center foundation, rebar and concrete forms are being assembled while steel beams continue to be hoisted into place over what will be ...
-
Bangor Arena -- 01-05-2012
redbird007
57 views
The holidays are over and it's back to full weeks of work for Cianbro. The large dirt pile next to Main Street, composed mostly of earth excavated for the west wall of the ...
-
Bangor Arena -- 12-28-2011
redbird007
41 views
Steel work plods along on a dark, wet, muddy day with a decreased workforce. The area where the banquet portion of the arena and civic center will be is being cleared up.
-
Bangor Arena -- 12-22-2011
redbird007
32 views
The erection of the arena's steel frame picks up as the crane operator takes non-verbal cues from workers securing the girders to the crane's hook and from workers awaiting...
-
Bangor Arena 12-14-2011
redbird007
61 views
The large crane that arrived on site last week now erected, work has begun in earnest on putting up the steel. This week's steel work is concentrated in the southeast corne...
-
Bangor Arena 12-08-2011
redbird007
32 views
Temperatures have dropped to more seasonable levels, and with them a chilly wind. A crane has been delivered to the site in preparation for the steel work, which is expecte...
-
Bangor Arena --12-01-2011
redbird007
25 views
After a long Thanksgiving break, Cianbro has sped up work along the new arena's west wall, which is quickly taking shape. The arena's loading dock area has been paved and t...
-
Bangor Arena -- 11-25-2011
redbird007
28 views
A short week at the site, as a storm drops 8.5 inches of snow on Nov. 23, canceling an entire day of work, and workers take Thanksgiving Day and the day after off.