Uploaded videos
1-10 of 13-
Pärlan - Fitting the engine surround box
parlanrenovation
564 views
Fitting the engine surround box on Pärlan; a 1958 wooden sardine trawler.
-
Pärlan - Painting the wheelhouse
parlanrenovation
408 views
Renovating and painting the wheelhouse on Pärlan; a 1958 wooden sardine trawler.
-
Pärlan - Preparing the wheelhouse for painting
parlanrenovation
284 views
Renovating and painting the wheelhouse on Pärlan; a 1958 wooden sardine trawler.
-
Pärlan - Fitting the fuel tank and exhaust
parlanrenovation
293 views
Putting in the fuel tank and exhaust on Pärlan; a 1958 wooden sardine trawler.
-
Pärlan - Fitting the stern flooring
parlanrenovation
266 views
Putting in the stern flooring on Pärlan; a 1958 wooden sardine trawler.
-
Pärlan - Putting in the stern flooring
parlanrenovation
400 views
Putting in wooden beams for flooring on Pärlan; a 1958 wooden sardine trawler.
-
Pärlan - Day6: cleaning the engine and the bilge
parlanrenovation
1,937 views
Day 6 on Pärlan; a 1958 wooden boat. Today I cleaned the engine and continued to clean out the bilge - nasty oily work:)
-
Pärlan - Day5: removing wood and finding leaks
parlanrenovation
564 views
I removed the last of the interior wood today, pulled a load of rubbish out of the bilge and cleared up.
-
Pärlan - Day4: Tidying up the bow section
parlanrenovation
558 views
First spring day on Pärlan and it's time to tidy up the bow section and remove the last of the pine wood that will stop her from drying out.
-
Pärlan - day 3: opening up the back of the boat
parlanrenovation
380 views
Spent the day trying to uncover the engine and get myself a decent working area so that I can service it.
Advertisement










Play all(13)