Uploaded videos
1-10 of 64-
u4 spent fuel pool video showing debris.wmv
NEImagazine
23 views
Fukushima Daiichi unit 4 spent fuel pool video shows debris on top of fuel assemblies. The camera is assessing the clarity of SFP water. The camera has been lowered about 1...
-
first view inside the FD2 PCV (digest).wmv
NEImagazine
35 views
First view inside the Fukushima Daiichi unit 2 primary containment vessel (PCV), courtesy of TEPCO
-
763-areva-131211-conference-eng-edited-package-web.mp4
NEImagazine
52 views
Luc Oursel, Areva CEO, delivers the bad news
-
areva radwaste shipment overview (in French).mp4
NEImagazine
49 views
Initial text reads:
"Before the end of 2011, following an inter-governmental agreement between France and Germany, a convoy will return 120 tones of vitrified nuclear waste...
-
areva la hague radwaste & recycling operations.mp4
NEImagazine
184 views
-Aerial views of the Areva La Hague plant
-Aerial views of the Valognes rail terminal
-Used fuel unloading and storage
-Fission product vitrification
-Load-out of vitrified...
-
areva radwaste load-out.mp4
NEImagazine
35 views
Areva radwaste load-out
-
areva radwaste radiological measurement.mp4
NEImagazine
22 views
Radiological checking before La Hague departure
-
areva radwaste road convoy.mp4
NEImagazine
20 views
Truck route from La Hague to the rail terminal point of Valognes
-
areva radwaste road-rail transfer.mp4
NEImagazine
25 views
Transshipment of truck load on freight wagons
-
FDu3 robot survey 3.wmv.wmv
NEImagazine
19 views
Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
(Videotaped on November 14, 2011). Link to slides: http://tinyurl.com/7ugot5h
Advertisement










Play all(64)