Uploaded videos
1-10 of 22-
National Power Mains Part 2
interpowercorp
14 views
-
Vineyards of Tassel Ridge Winery
interpowercorp
676 views
See Tassel Ridge WInery vineyard overflights.
-
National Power Mains Part 3
interpowercorp
42 views
Three part series that talks about the Power Mains world wide and what you need to look for when traveling or exporting products.
-
National Power Mains Part 2
interpowercorp
52 views
Explaining National Power Mains and what everyone needs to know concerning exporting globally.
-
National Main Outlets - Part 1
interpowercorp
88 views
Judy Nunnikhoven of Interpower Group of Companies describes the National Main Outlets for North America and Japan in the first part of this two part series.
-
Interpower Corporation Hospital Grade Powercords
interpowercorp
698 views
Interpower describes how to properly insert the plug and inspect the plug, cord and connectors without damaging the plug.
-
Interpower Temperatized Test Equipment
interpowercorp
166 views
Both IEC 60320-1 (appliance couplers) section 21 and IEC 60884-1 (plugs and sockets) section 19 require temperature rise testing. IEC 60320-1 requires testing for 1 hour at...
-
Interpower Insertion-Withdrawal Testing
interpowercorp
180 views
Electrical sockets, outlets and their internal contacts normally must meet insertion and withdrawal force requirements. This test station is easily configurable to conduct ...
-
Interpower Crimp Pull Test
interpowercorp
378 views
A quality crimp results in a strong resistance to pull off forces. Samples are positioned in fixtures that anchor the crimped terminal and pull out the stranded conductors,...
-
Interpower Crimp Cross Section Station
interpowercorp
357 views
A quality crimp requires proper crimp geometry and strand compression. Samples are prepared by cutting, grinding and polishing crimp cross sections to visually inspect the ...
Advertisement










Play all(22)