Uploaded videos
1-10 of 15-
MOV01485.MPG
g4ezz
255 views
Braun 3500 in 48V battery charging configuration, 400Ah and Victron Multi 5000 inverter off grid
-
MOV01441.MPG
g4ezz
79 views
New installation, new turbines, two FE1012U in Plerguer (35)
-
MOV01426.MPG
g4ezz
71 views
Dordogne turbine in the evening gloom.... 30 January 2010
-
MOV01421.MPG
g4ezz
424 views
Installation done last weekend... near Bergerac, Montana 240V battery charging turbine with UPS style inverter.... 30-01-2010........... another turbine, over 30 in the las...
-
Fortis Montana installation
g4ezz
541 views
Fortis Montana installation fait en septembre 2009 à Pluhinec près de Vannes (56)
-
MOV01075
g4ezz
343 views
Fortis ALIZE... 10KW installed in Normandy by A.M.I..... shortly to have its first maintenance schedules done and modifications to the "flight envelope"
-
Fortis Montana Irodouër France
g4ezz
173 views
Another shprt
-
Fortis Montana on a 24m / 80 ft guyed tower
g4ezz
292 views
Installed just a week ago near to Becherel in Brittany, grid connected, wind turbine
-
Fortis Montana installation Caen
g4ezz
199 views
Another inherited wind turbine site, sold to a family, the company disappears with the profits and A.M.I. enetr into action.... poor siting.... Fortis Montana in an urban site
-
Fortis Montana Wood Cafe Avranches
g4ezz
177 views
Not an A.M.I. installation, but one that was in a non operational condition.... several weeks in intensive care with Doctor Derek, and the machine has been running like a d...
Advertisement










Play all(15)