Alert icon
Alert icon
Alert icon
Alert icon
Alert icon
ClockSpringCompany

ClockSpringCompany's channel

by ClockSpringCompany

Loading...

3 subscribers
453 video views
2 months ago

INSTALLER UPDATE: How to Remove Filler Putty from New Foil Pouch System

Instructional video on removing filler putty from new foil pouch packaging system for Clock Spring.

3 months ago

Clock Spring Burst Test Result

Burst test on a composite repair spool based on ISO TS 24817 standards: Petroleum, petrochemical and natural gas industries -- Composite repairs fo...

3 months ago

Clock Spring Burst Test Video - March 1992

Before the ISO TS 24817 standards being issued, Clock Spring has undertake many testing to confirm the strength and capability of products.

The vi...

3 months ago

Clock Spring Installation Video

A video showing installation of traditional Clock Spring using the coil pass and/or support stand method.

4 months ago

Clock Spring Underwater Application

Clock Spring, the leader in compposite pipeline repair technology, has developed an underwater application.

4 months ago

Installing a 4" Clock Spring

Installation procedure for installing a 4" Clock Spring.

4 months ago

Crack Arrest Video 2

More testing of Clock Spring as a crack arrestor on transmission pipeline.

4 months ago

Crack Arrest Video 3

Testing video demonstrating use of Clock Spring for crack arrestor on an oil and gas transmission pipeline.

4 months ago

Crack Arrest Video 1

Video demonstrating the use of Clock Spring as a crack arrestor on a high pressure transmission pipeline.

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more
    to add this to a playlist