Uploaded videos
1-10 of 91-
Severn Valley Railway. Class 37906 leaving Bridgnorth. 17/07/09
bradleymanor
320 views
Class 37906 leaves Bridgnorth with a Driver Experience Course for Kidderminster.
-
Hafod Ruffydd to Rhyd Ddu. Part 3. WHR Test Train. 02/04/09
bradleymanor
508 views
We're now on Pitts Head straight and we follow the Beddgelert to Rhyd Ddu road. We also see a view of Snowdon Mountain. We then come into Rhyd Ddu station.
-
Hafod Ruffydd to Rhyd Ddu. Part 2. WHR Test Train. 02/04/09
bradleymanor
265 views
We now pass Pont Caer Gors and then we climb up to Pitts Head Summit. We then go under Pitts Head bridge.
-
Hafod Ruffydd to Rhyd Ddu. Part 1. WHR Test Train. 02/04/09
bradleymanor
240 views
We now continue our journey from Hafod Ruffydd towards Rhyd Ddu.
-
Above Meillionen Forest Halt to Hafod Ruffydd. Part 2. WHR Test Train. 02/04/09
bradleymanor
70 views
We now continue our journey from Part 1. We see the lower part of the railway which we rode on Part 1. We go passed Canal Curve and then through the Forest and on the appro...
-
Above Meillionen Forest Halt to Hafod Ruffydd. Part 1. WHR Test Train. 02/04/09
bradleymanor
242 views
We now go from just above Meillionen Halt over the minor road level crossings. At Weirglodd Isaf we see the upper part of the railway doubling back on itself and the footag...
-
Upper Cwm Cloch to just above Meillionen Forest Halt. WHR Test Train. 02/04/09
bradleymanor
271 views
We now go from above Upper Cwm Cloch to above Meillionen Forest Halt. We pass through the barrier gated level crossing at Ty'n y Coed. We then go past Meillionen Halt. Meil...
-
Lower Cwm Cloch to above Upper Cwm Cloch. WHR Test Train. 02/04/09
bradleymanor
306 views
We now continue with our journey from Lower Cwm Cloch through Cutting Mawr to above Upper Cwm Cloch. The line here doubles back on itself to gain height at the S bends. Thi...
-
Beddgelert to Lower Cwm Cloch. WHR Test Train. 02/04/09
bradleymanor
774 views
On this day myself and my father took a ride on one of the test trains that were operating. The train was hauled by diesel loco Funkey Vale of Ffestiniog. The Festiniog Rai...
-
Cwm & Go(ne) Railtour. Park Junction to Newport Tunnel. Part 3. 28/03/09
bradleymanor
150 views
Having just gone through the 400 yard tunnel on the railway, we now come to the end of our journey on this short freight only line from Park Junction to Newport Tunnel. Eb...
Advertisement










Play all(91)