Uploaded videos
1-10 of 21-
There will be MORE Blood
blueionrich
58 views
Beta version of There will be MORE Blood with Daniel Day Lewis. The final scene where Daniel Plainview talks Milkshakes and Drainage with Eli before throwing him across the...
-
Rooftop Deck Timelapse at 301 King
blueionrich
843 views
Construction of the IPE palletized deck on the outside mezzanine rooftop.
-
Building/Finishing Stage in 301 King Street
blueionrich
108 views
We built the stage with hardwoods. The finish is stained dark to help match the mahogany dark wood in the kitchen cabinets, stairs, and old wood beams.
-
Mezzanine Stairs 301 King Street
blueionrich
319 views
Using reclaimed wood from the 100 year old wood beams, we milled our stair treads for use on our Mezzanine stairs.
-
301 Conference/Game Room Hardwoods
blueionrich
36 views
Timelapse of Caribbean Pine Hardwoods being laid in 301 King Street "Gameroom" ... or Conference Space.
-
301 King Main Hardwood Floors
blueionrich
100 views
Timelapse: Laying down of Caribbean Pine Hardwood floors in our main space. Sanding, Finishings, staining.
-
Jun1 Jun14 Wiring Movement
blueionrich
29 views
Structured Wiring going in, and then a lot of just movement of people around the office.
-
Jun26 Jul9 DryWall ElevatorBathroom
blueionrich
49 views
Installation of Dry Wall around the Elevator shaft and Bathroom area.
-
May23 May24 InsideNewDeck
blueionrich
18 views
New Deck being constructed on the outside. New Roof is in to allow for this outdoor/indoor space to be created.
-
May16 May21 InsideNewRoof
blueionrich
20 views
Advertisement










Play all(21)