Uploaded videos
1-10 of 21-
Ross Contracting Inc
airminzey
9 views
at the creek job setting up the porta dam system to fix the 12 DIP in the creek.
-
wood elevator sale.
airminzey
74 views
Hydraulic powerd wood elevator used at an old firewood processing farm.
Has new red oak wood bed for the chain conveyor. will run off the processor or aux circuit on a log...
-
Ross Contracting
airminzey
37 views
Lifting the T-190 with the Hitachi 225 at Twinbrook Metro for the Excavation Crew.
No other Way into the Hole, Very impressive lift capability of the 225. Bobcat weighs 82...
-
miscelaneous 557
airminzey
34 views
-
Ross Contracting.
airminzey
78 views
Description of the pile work we are performing on the 96" watermain Inspection pit.
-
potomac 96"
airminzey
29 views
continued excavation of the 96" water main. this time is tight confines betwenn the cross braces
-
potomac 96" water main
airminzey
74 views
excavating with the Clamshell bucket on the Hitachi 225 while preparing for shoring on the 96" water main.
ross contracting.
-
dalecarlia Pipe Sink.3gp
airminzey
68 views
The Guys trying to resurface the Bags after they are pulled to the bottom from sinkinking the Line.
-
Ross contracting, Inc.
airminzey
155 views
After closing the tracks, we are trying to move the Lima across the bridge to continue Piling.
-
Ross Contracting, Inc.
airminzey
343 views
Driving Piles around the Twin 66" Storm lines, in preparation for the construction of the new concrete Pond Riser. The pile operation took place next to Woodmont Ave.
Advertisement










Play all(21)