AcerMetric Build Sequence 001.wmv
Versatile Quick Build Elemental Building Construction System
Any SHAPE
Any STYLE
Any SIZE
davidsforum • 176 views
Autodesk Inventor Publisher
Autodesk Inventor Publisher allows manufacturers to quickly and easily produce technical manuals, service documentation, assembly guides etc. Using...
manufacturingarea • 10,615 views
AcerMetric Build Sequence April 2012 Plus Music
5 Day Build - Using the AcerMetric Versatile Elemental Precision Engineered Construction System to produce a 3 Bedroom 5 Person Affordable House.
19 views
-
4 weeks ago
acermetric1
favorited
-
1 month ago
acermetric1
liked
AcerMetric Final Build Sequence 26 Mar 2012
The AcerMetric Versatile Precision Elemental Construction System can produce an almost infinite, shape, size, style & application of building. This...
57 views
SEP 06 Update Build Sequence 2
Build Sequence - cropped to fit screen
366 views
-
8 months ago
-
8 months ago
Latest Build Sequence
This Video has been updated following discussions to incorporate changes suggested for our website.
It is not the final video and will be regularly...
751 views
-
8 months ago
Updated AcerMetric Build Sequence
This updated video includes some interior clips showing stairs windows doors and interior cladding. Also shows the one tool does all picture in pic...
521 views
-
9 months ago
acermetric1
commented:
Superstructure CAD Build Sequence
This Video Clip shows the CAD build sequence and should be viewed in conjunction with the actual build sequence
489 views
-
9 months ago
acermetric1
favorited
AcerMetric You Tube
This sequence was the original build that was later dis-assembled and shipped to its new site at Fyfield Essex
173 views
-
9 months ago
acermetric1
favorited
AcerMetric 5 Day Build - Cost Effective Quality Housing.avi
The AcerMetric Versatile Elemental Building System is Cost Effective Quick Precision Quality and Compliant. We will design and engineer the home th...
280 views
-
9 months ago
acermetric1
favorited
Thank you for your enquiry. The actual commercial kit includes plug and play electric looms and plumbing and these are installed during the build. So they are installed during the overall 5 Day build. The Slab foundation is installed and ready in about 7 Days, thereafter the complete system 5 da...