2nd day of drain tile and electrical conduit installation
ToadMan8
1,263 views
We're tired, but we're finished, and are quite happy with the product! Thanks to the guests who stopped by to share a home-brew beer!
-
Drain tile & electrical trench part 2
ToadMan8
849 views
This is Saturday afternoon.
-
Drain tile installation part 1
ToadMan8
13,018 views
It was cheaper to rent our own mini excavator to do the whole job than it would have been to have someone dig the trenches only. And a heck of a lot more fun! This is the...
-
Sowing winter wheat and starting the roof
ToadMan8
223 views
Special guests include Mike Beck and Luke Kellogg - much thanks to them!
We put down some winter wheat at the beginning to keep the soil up on the hill instead of washing ...
-
Phase two - Framing, roofing
ToadMan8
1,804 views
Special guest workers include Dad, Mom, Mike Dark, Mike Beck, and Luke Kellogg (in order of appearance).
-
Phase two - Framing, etc
ToadMan8
487 views
I am missing the footage of the first three walls; I'll upload that when I'm at home again. This is the front wall, moving bracing to the inside, and applying OSB on the o...
-
Whole pad and driveway
ToadMan8
786 views
This is just about the whole concrete portion from start to finish. Sorry about the fog in the early morning - the camera is in my bathroom window and the shower makes it ...
-
Garage Building Day 2 Part 2 - Forms (part 1)
ToadMan8
372 views
This is the third time-lapse. This is the placing of the forms yesterday. Today will see the remainder of the forms, and possibly the slab poured.
-
Garage Building 2 - Footers
ToadMan8
1,480 views
This is the second time-lapse. This is the pouring of the footers.
-
Day 1 - Excavation
ToadMan8
315 views
This is the first part of the garage building project. I will likely tie things together in one video at the end. I think I will make a blog and link this to that later.