Uploaded videos
1-10 of 30-
Done ! well, almost...
Starrleo
21 views
All track and points are installed, now for the wiring up...
-
Staging Tracks and Reversing Loop
Starrleo
22 views
Just finished installing the sides to the woodwork, it provides a 1 inch high 'fence', hope that is enough as the track is 6' 5" high...
-
A wee Porter working hard on the F&B RR incline
Starrleo
41 views
Test run on the F&B RR incline, a wee sound-equiped Porter pushes a flatcat with the key-chain cam on it. Near the end of the video we pass through the 'tunnel' aka hole-in...
-
F&B RR Staging Tracks
Starrleo
25 views
A pan/tilt webcam view of the F&B RR staging tracks, i.e. the woodwork so far...
-
River Maas December 9th 2011 part 2
Starrleo
15 views
We took our Eista Krammer 'Vesta' to the wharf for a mid-life revision, short trip on the river Maas.
-
River Maas December 9th 2011 part 1
Starrleo
10 views
We took our Eista Krammer 'Vesta' to the wharf for a mid-life revision, short trip on the river Maas.
-
Staging Tracks Benchwork
Starrleo
22 views
Benchwork for the staging tracks in the room next to the layout room, I installed a webcam on the ceiling to give a remote view on a 7" tablet, route setting will be via an...
-
Railbus modification
Starrleo
60 views
Trying out a back-up light on the Bachmann railbus
-
Pan / Tilt Webcam on the Farmers & Bluestone Railroad
Starrleo
41 views
I re-installed the pan/tilt webcam in it's original corner of the lay-out room, I/O cable and all. Now to work on the lights-on & train starting electronics !
-
Runaway flatcar
Starrleo
93 views
Better buckle up and hold on !
Runaway flatcar on the F&B RR Inclined Plane, first test of the temporary track which I'll use to put the Garratt trough it's paces.
Advertisement










Play all(30)