Uploaded videos
1-10 of 16-
HOT Cell 1, Idaho National Laboratory
MyCJ4Rox
28 views
Hot Cell 1 in its new resting place.
-
HOT Cell 1, Idaho National Laboratory
MyCJ4Rox
33 views
Entering the ICDF for subsequent diposal
-
HOT Cell 1, Idaho National Laboratory
MyCJ4Rox
32 views
Riding shotgun with SWIR Heavy Transport operator as we travel down to the ICDF with 1,200,000 lbs in tow!
-
HOT Cell 1, Idaho National Laboratory
MyCJ4Rox
50 views
Beginning the transport 2.5 miles to the ICDF
-
HOT Cell 1, Idaho National Laboratory
MyCJ4Rox
19 views
Placement of Hot Cell 1 and containment pan on Goldhofer trailer
-
HOT Cell 1, Idaho National Laboratory
MyCJ4Rox
35 views
Goldhofer staging for Hot Cell 1 and Containment Pan transport. These items combined weighed closed to 600 tons or 1,200,000 lbs.
-
HOT Cell 1, Idaho National Laboratory
MyCJ4Rox
67 views
Southwest Industrial rigging staging their Prime Mover and 14 line, twin Lane Goldhofer trailer in preparation for Hot Cell 1 transport to the ICDF for disposal
-
HOT Cell 1 Idaho National Laboratory
MyCJ4Rox
26 views
Placing the ~1,000,000 pound Hot Cell into the containment Pan
-
Explosive Demolition of Hanford Site 284 East Power House Chimneys, Coal Silo and Baghouses
MyCJ4Rox
799 views
CDI/Clauss Construction explosive demolition of the 284 East Power house Chimneys, Coal Silo and associated baghouses from control point
-
Explosive Demolition of Hanford Site 200 East Water Tower
MyCJ4Rox
118 views
CDI/ Clauss Construction explosive demolition of the water tower located on the Hanford Reservation at the 200 East Area from the control point
Advertisement










Play all(16)