Uploaded videos
1-10 of 23-
Shunting In The Snow
EORtv1
809 views
Class 31 collects the Macaw flatbed before journeying down the line with our Permanent Way team, as they set out to clear more vegetation from the lineside, but with a cove...
-
Tamper 73241 in action at EOR
EORtv1
1,466 views
Tamper-liner 73241 in action between Ongar and North Weald, tamping and lining the track to get the rails level and ready for passenger trains.
More volunteers to help out...
-
EOR: Your Railway Needs YOU!
EORtv1
392 views
As the line progresses towards opening, we need more volunteers to help complete the restoration works. This video gives you a behind the scenes glimpse at the works, and s...
-
EOR Ballasting At North Weald
EORtv1
392 views
Ballasting is now underway at North Weald Station.
Seen here, 03170 shunts the Dogfish ballast wagon through platform two spreading the ballast onto the track. The P-way t...
-
EOR 3CIG 1498 Arrives at the EOR
EORtv1
318 views
Video of the first coach of the 3-coach "3CIG" 1498 being delivered to the Epping Ongar Railway. All 3 coaches have now arrived and have once again been made up into the se...
-
EOR Thumper 205205 first trip to North Weald
EORtv1
1,688 views
The eor thumper 205205 making its first daylight run on the EOR metals. Thanks to James for the video
-
EOR Thumper 205205 first move under its own power
EORtv1
869 views
"Thumper" 205205 (formally 1111) makes its first moves under its own power!
When it was delivered to EOR (14/11/09), she was unloaded onto the tracks of Platform 2, which w...
-
EOR Ballasting at Ongar
EORtv1
1,030 views
A short collection of clips showing the ballasting operations currently underway at EOR as we get the branch ready for locomotive hauled trains
-
EOR Class 31438 first start at The EOR's North Weald Station Yard
EORtv1
1,177 views
BR Class 31438 first start at North Weald Station Yard after being delivered from the Mid Norfolk Railway to the EOR.
-
EOR Tamper 73241 in Action
EORtv1
812 views
Tamper-liner 73241 in action on another heritage line. This video shows the tamper-liner lifting the track, before moving the ballast up underneath it to correct the rail a...
Advertisement