Loading...
These fabrications by Steel Engineering Ltd were loaded out by barge and shiiped to Harland & Wolff by Coastworks. The fabrications are part of th...
pbsteelengineering • 373 views
Hunterston Jetty on the 8th December 2011 over high tide and during strong South Westerly winds.
92 views
Our multicat Challenger carrying out some piling works at Seaport Marina in the Caledonian Canal near Inverness.
122 views
Coastworks 15m x 6.6m 570hp steel multicat type workboat running at full speed down the Firth of Forth. This vessel is due back in the UK after al...
1,107 views
Coastworks designed and installed a "bubble curtain" around the cooling water intakes at Hunterston Power Station. The bubbles prevent jellyfish f...
875 views
Coastworks new 30m x 11.2m x 2.5 flat top spudleg barge. Loaded with steel beams and old deck gear, this video was taken the day the barge changed...
217 views