Uploaded videos
1-10 of 12-
Guided Boring Machine (GBM) Product Video in HD
AkkermanInc
50 views
The Akkerman Guided Boring Machine (GBM) method, also known as pilot tube microtunneling, offers customers extended and accurate drive lengths in various ground conditions....
-
Guided Boring Machine (GBM) Product Video in SD
AkkermanInc
20 views
The Akkerman Guided Boring Machine (GBM) method, also known as pilot tube microtunneling, offers customers extended and accurate drive lengths in various ground conditions....
-
Pilot Tube Removal Using Breakout Tool Kit
AkkermanInc
120 views
This video shows how you remove the pilot tubes using the pilot tube breakout kid. The video of the Akkerman 4812 GBM system was taken in Houston, TX at Boyer Inc. jobsite.
-
GBM 4812 Operation and Spoil Removal
AkkermanInc
145 views
In this video, we are shown the Akkerman GBM 4812 in operation and we get a look at the spoil removal process as well. The video was taken at a Boyer Inc. jobsite in Housto...
-
Reaming Head Advancement with Casings and Augers Using 4812 GBM
AkkermanInc
126 views
In this portion of the Boyer Inc. jobsite in Houston, TX, we are shown how the reaming head advances with the placement of the augers and casings portion of the GBM process.
-
Standard 16" Reaming Head GBM Pilot Tube Installation
AkkermanInc
499 views
In this video, the standard 16" reaming head is installed behind the last length of pilot tubing. The customer also owns a 16" HD bearing swivel head but the ground conditi...
-
Akkerman - Guided Boring Machine (GBM) 240 - Installation of Pilot Tubes on a job site.
AkkermanInc
465 views
Installation of Akkerman dual wall pilot tubes with an Akkerman GBM 240 and guidance system.
-
Step 3: Guided Boring Machine (GBM) - Three Step Process - Product Pipe
AkkermanInc
520 views
An animation for the Akkerman GBM:
This one features the product pipe step for step three, for installations of 11" up to 16" OD pipe.
The other options for step three ...
-
Step 2: Guided Boring Machine (GBM) Three Step Process - Augers and Casings
AkkermanInc
467 views
An animation for the Akkerman GBM:
Akkerman's Guided Boring Machine (GBM) method, also known as pilot tube microtunneling, offers customers extended and accurate drive len...
-
Step 1: Guided Boring Machine (GBM) Three-Step Process - Pilot Tubes
AkkermanInc
598 views
An animation for the Akkerman GBM:
Akkerman's Guided Boring Machine (GBM) method, also known as pilot tube microtunneling, offers customers extended and accurate drive len...
Advertisement










Play all(4)