Uploaded videos
1-10 of 10-
DC: Last Night of Construction
4Dhome
106 views
All hands on deck for the last night of construction before the exhibition portion of events. There is work being done everywhere.
-
Time-Lapse: Trellis and PV assembly in DC
4Dhome
332 views
Over 24 hours of time-lapse footage of the team putting together the trellises and installing Photovoltaic panels on lot 401 in the Solar Village.
-
Time-Lapse: House Module Assembly in DC
4Dhome
346 views
From the afternoon of Thursday September 15th, overnight into the wee hours of the 16th, Team Massachusetts assembles the 4D Home at the Solar Decathlon 2011 in Washington DC.
-
Time-Lapse: One Week in Construction
4Dhome
158 views
After the modules are set together, the team goes full-force on the rest of the house. September 3rd to September 10th.
-
Time-Lapse: Roof Module Sheathing
4Dhome
89 views
Roof Sheathing on the North module.
-
Time-Lapse: Module Assembly 5:23AM to 10:15AM
4Dhome
219 views
We convened at Epoch Homes in the pitch blackness of Epoch's lot at 5:00 AM to prepare the blocking for the modules to sit on. Eventually, the crane and module crew shows u...
-
Time-Lapse: Truss Construction
4Dhome
370 views
2011-08-22
Team Massachusetts members working at Epoch Homes, Pembroke NH, building the roof trusses of the 4D Home.
-
4D Home Animated Walkthrough
4Dhome
2,414 views
An animated walk through of Team Massachusetts 4D Home with more current interiors. Posted August of 2011.
-
4D Home Engineering AV Presentation
4Dhome
258 views
US Department of Energy Solar Decathlon 2011
Team Massachusetts 4D Home Engineering Presentation
This presentation discusses the photovoltaic system, hybrid solar panels,...
-
DD Scale Model at IBS 2011
4Dhome
63 views
Panning shot of the DD scale model at IBS 2011. Photos here: http://www.flickr.com/photos/julie_chen/sets/72157625940213902/
Advertisement










Play all(10)