lewod1's Channel
 
NMA nearing completion Mike's Mini Machines lewod1 - 18 views - 1 month ago
The National Museum of Australia job is now nearing completion. With over 200 cubic meters of materials removed including 140 cubic meters of rock (black limestone with quartz seams) the new storage area will have a floor area of approx. 160 square meters.
rHMdRliDioM
Mike's Mini Machines NMA Hammering compacted granite and dingo lewod1 - 54 views - 3 months ago
After hammering the very well compacted granite fill it is removed with a mini loader to a tipper through the opening. www.mikesminimachines.com.au
sNECYDMJ06c
Mike's Mini Machines NMA Hammering compacted granite lewod1 - 231 views - 3 months ago
The granite fill had been comacted so well the use of a rock breaker was necessary for excavation. The material was loosened with the hammer and removed to a 3 tonne tipper with a dingo mini digger. www.mikesminimachines.com.au
NEa2xrMqC_k
lewod1  
Profile
 
Channel Views:
259
Age:
37
Joined:
January 11, 2008
Last Sign In:
1 month ago
Videos Watched:
228
Subscribers:
4
Country:
Australia
Recent Activity  
lewod1 uploaded a new video (1 month ago)
The National Museum of Australia job is now nearing completion. With ove...   more
 
 
lewod1 uploaded a new video (3 months ago)
After hammering the very well compacted granite fill it is removed with ...   more
 
 
lewod1 uploaded a new video (3 months ago)
The granite fill had been comacted so well the use of a rock breaker was...   more
 
 
lewod1 uploaded a new video (3 months ago)
At the National Museum of Australia in Canberra Mike's Mini Machines is ...   more
 
 
lewod1 uploaded a new video (3 months ago)
At the National Museum of Australia in Canberra Mike's Mini Machines is ...   more
 
Channel Comments
There are no comments for this user.