Alert icon
Alert icon
Alert icon
Alert icon
Alert icon
danbrownassociates

Dan Brown and Associates

by danbrownassociates

Loading...

2 subscribers
4,080 video views
1 year ago

Hastings Bridge Pier 10 Statnamic Test

42" open-ended pipe pile with 7/8" wall being tested with a 30MN axial Statnamic device.

2 years ago

I-15 Beck Street Bridge Bent 4 - Oscillator 1 - Feb 2009

Drilling a 9.2 ft diameter shaft using an oscillator to advance a temporary casing into the ground ahead of the excavation.

2 years ago

I-15 Beck Street Bridge Bent 4 - Digging with grabs - Feb 2004

Excavating inside a 9.2-ft diameter temporary casing using grabs. Spoils are put in trucks to haul off.

2 years ago

Audubon Bridge - Shaft W21 casing extraction - July 2007

Extracting an 8-ft diameter casing for a drilled shaft at the Audubon Bridge.

2 years ago

I-15 Beck Street Bridge Bent 4 - Oscillator 2 - Feb 2009

Drilling a 9.2 ft diameter shaft using an oscillator to advance a temporary casing into the ground ahead of the excavation.

2 years ago

Audubon Bridge - Shaft E5 excavation - Sept 2008

Excavation of 8-ft diameter drilled shaft foundation for Audubon Bridge using oscillator and dredge pump. Reinforcing cage for another shaft is bei...

2 years ago

Audubon Bridge - Temporary bent piles - Sept 2008

Driving 5' diameter pipe piles for a temporary bent on the east side of the river. The temporary bents help hold the spans up until the cables are...

2 years ago

Lowry Ave MN Statnamic Lateral 2009.mp4

Lateral Statnamic test on a 24" diameter pipe pile. Test conducted on a barge.

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more
    to add this to a playlist