Added: 2 years ago
From: C60AC
Views: 1,576
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (38)

Sign In or Sign Up now to post a comment!
  • Dont worry, everything will work out. Although Donner Pass is the more ideal route for intermodal traffic, I am certain UP will still keep the FRC line open. There are still manifest and dirt trains that run through the area regularly. Not only that, but if there were ever a problem on Donner, such as a derailment or too much snow, UP will need this route to keep all of their trains moving. Like the huge derailment on Donner last August that forced all freights over the FRC. I am not worried.

  • @Alwaystrains with the heavy-loaded train,snow is not a problem,haha

  • @kekedog It is if he's going uphill.

  • FRC has a much lower ruling grade than Donner, so i'm sure it'll have a future still.

  • at the end of your video where is that yard and do you have any photos of it going to model the feather river canyon in HO and need information about what's there.

    Jimmy

  • Sucks to hear that. I'm sure they will reroute Intermodal traffic through FRC on those occasions. Great video 5/5

  • Right now the canyon is really dead during the day due to major track work, after this work is done Donner will be strictly Amtrak and intermodal and everything else will go through the canyon

  • I'm really going to miss working in the canyon. Off to Sparks I go....

  • The first east bound Intermodal went over Donner Summit on November 19, 2009. The first west bound Intermodal was the next day. My husband was the Engineer on that train. He too is going to miss the days of going down the FRC.

  • Hey Didn't I Saw A SD90Mac........

  • Very well done video!!  the editing is amazing

  • This must be happening at the end of November. I was camped at Poe last night and saw at least three UP intermodals going east.

    BTW nighttime railroad operations when viewed from the floor of the canyon is a great experience.

  • I heard from a very good source just yesterday that UP will have Donner open to intermodals as of tomorrow, the 7th and that is when they should have a few stacks "test" the tunnel work. Some intermodals will apparently be routed through FRC over the next couple weeks but all should be phased out to Donner by Thanksgiving.

  • What will happen to the FRC? Will there still be other freight trains?

  • Yes, Union Pacific will still run freights not on a time-sensitive schedule through there and BNSF still have 2 daily trains.

  • You are correct. Though, just the other day I heard from my buddy up in Red Bluff that BNSF will be running 6-8 freights daily after the intermodals are gone. This is an increase of about 2 to 4 trains, now that there will be more room to run their trains quicker and more efficiently through the FRC.

  • Maybe all we are seeing then is a changing of the guard. It happened when the Union Pacific took over the WP, and perhaps BNSF will increase traffic on the FRC so they can secure a route to and from the Port of Oakland.

  • @C60AC Newsflash, James (aka Coaststarlight11) says UP will once again run stackers through the FRC as well as autos and heavy haulers. The Donner will be shut down for freights for maintenance. Only AMTK #5 and #6 will be regular runs while CTC is installed.

  • Yes, supposedly. Funny how things come back around, I told James about it! LOL. Thanks for the heads up. I'm keeping James updated as to when I start seeing/hearing an increase in traffic so he can go out to Gerlach and catch some rerouted intermodals out there. I'm not exactly sure what's going to happen though, at this point the whole thing is still only hearsay. No one has any solid facts about this happening. I first heard it from a source in Portola.

  • My friend who works for UP said that all heavy westbound trains will take the canyon

  • Very nicely done. Interesting! I always though that stacks were always being over Donner.

  • This vid is major epic to the absolute max!!!!

    It will be nice to see stack trains on Donner again (after almost 15 years) but yet it will be sad to see them leave Feather River.

  • Nice video. I almost cried, well not really but it is a bit sad. 5/5 and favorited.

  • Nicely done all around. Excellent editing, and this comment is from a former video editor.

    Choice of music was nice. Ten stars from me too.

  • Very nice work, and what a great song choice. I haven't been there for so long, I need to get one last glimpse of a stack train through the canyon.

  • Very interesting....Your Description is amazing, you can never get tired of a colorful box going down the tracks.

  • Nice collection. I'll miss them to. At least you got till Thanksgiving.

  • Even though grain trains and low priority manifests will still travel the FRC, it's still sad to see intermodals and priority trains not going through there. Excellent footage and made more dramatic with a legendary song.

  • Appropriate use of the song, and good use of the fade. Think that the line will be totally abandoned?

  • It won't, BNSF trains, as well as UP manifests and grain trains will come through

  • Oh, not a total loss then.

  • Nope, but it is a reduce in traffic

  • Thats too bad, i love both routes, hate to see this one go

  • Great vid, very nicely done. 5*'s

  • Good use of my pictures, everything is excellent, superb, and mega hella fuckin awesome!!!!!!!!!

  • WOW, great video, 10 stars, that is sad, ya like you said you don't know what you have until it is gone, Sad, but A GREAT VIDEO!!!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more