Added: 1 year ago
From: koalabear72
Views: 656
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (8)

Sign In or Sign Up now to post a comment!
  • Why would GO or CN install a GATED crossing for a driveway? What a waste of money. A Private Crossing sign would have been sufficient!

  • @ALuimes Looks like it's a public road. Also it's on a curve with passengers able to go 80 mph and freights at 60 mph. They need to give cars warning at that speeds, even if the road traffic doesn't warrant it. They don't want a road-train accident at those speeds...

  • Ha I think I saw you guys filming, I go to scalen creek sometimes to watch the trains come home. It''s right near there and I drove near that crossing last week and saw some people with cameras.

  • That's awesome some guy owns a completely protected railroad crossing! Wow, if i lived by the tracks and my driveway crossed over the tracks i'd definately pay for that! With asking for horn warning protection as well. Nothing more you could ask for!

  • BTW, im surprised there is still and industrial freight through Barrie daily. Rail freight service is slowly depleting over North America. The Oakville Sub between Mimico and Union Station no longer have any freight activity. Eventually the Barrie Collingwood Railway will be gone. Its unfortunate. Trucks are starting to rule freight transportation.

  • @RailfanDaniel as long as I can remember, the BCRY thru Barrie has only had 1-10 cars in tow, depending on the orders companies it serves place.

    when CN came through, there'd be anywhere from 1-50 cars in tow... that ended in 1995 (maybe 1998) and BCRY has struggled since the take over

  • @rolls283 Oh so they've struggled? That sucks. Its the same out in Niagara with Trillium Railway (TR). Although, i don't suggest CN taking over it again. CN doesn't know how to do industrial switching anyways, they treat their customers badly. I think BCRY should be taken over by Rail America. Same with TR. RA treats their customers well and will probably get the loads back to a maximum of 50 cars. BCRY unfortunately is too small of a company to be successful, RA is a very big company.

  • Great video! Im glad GO has really worked to get the service back to Barrie renovated to great shape! 80mph is very impressive. Im surprised GO actually got the speed limit up that high. Obviously they'd do so some renovating, but usually only to allow 50mph service. Well, it is a 24 minute run between Bradford and Barrie. It would probably be 35 if they didn't raise the speed limit. I hope GO will eventually make more of the Barrie line 80mph so the 1 and a half hour trip can be shortened.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more