Added: 3 years ago
From: dumbbuff
Views: 1,749
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (5)

Sign In or Sign Up now to post a comment!
  • The interlocking is operator controlled. You'll notice that eastbound blue line trains stop in advance of the switch and select the diverging route. The blue/green lines are automatic block signalled--not centrally controlled. Cab signals begin just west of E.79 (trains always stop to press the cut-in switch there) and continue to Tower City. The red line is all cab signals.

  • the Red Line's also automatic block signalled aswell.

  • is that interlocking at shaker sq disp control or operator control? Also is this line signaled?

  • no crossing gates?

  • no need for crossing gates. The trains are controlled by regular traffic signals the control street traffic at every street crossing.

  • Loading comment...
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more