Added: 1 year ago
From: bootonie
Views: 1,630
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (12)

Sign In or Sign Up now to post a comment!
  • Nice work - you dont have a schematic of your track plan loaded anywhere do you? I would like to see it - im starting on a Blue Era to Sectorisation transition period layout. As when I was living in the UK last it was in that era and I used to catch train to work everyday from Streatham Common - would love to recreate some of that

  • How do your trucks and coaches make a clicking sound on the curves?

  • @cubeproduktion Hey. That would be from when he was laying the track, whether intentional or not, gaps in the track where they join together or it could be that he layed the track perfectly and over time with moisture, the heat and the cold, the board the track is set out on has expanded and contracted moving the track just as mine does in my atic and the clicking is just the wheels going over those gaps. The bigger the gap, normaly the louder and more noticeable the clicking is.

  • Thats an incredible model railway!

  • That looks awesome!! :)

  • Hi this is great some very good detail

  • Fantastic bridge looks great , great layout , thanks for showing.

  • Great!

  • such a good layout mate.lots of great detail.

  • The Viaduct looks very good 

  • wow, im not really into model trains but this set up is awesome (and expensive i guess) very impressive

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more