Added: 2 years ago
From: musicfreakcc
Views: 2,570
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (10)

Sign In or Sign Up now to post a comment!
  • wow i soo agree with everyone else who posted a comment on this video. It was amazing! exciting, funny, and inspiring from beggining to end!

  • interesting how they have the traditional dover hall-chime as a floor-passing chime

  • The motor sounds like its been replaced like the one in King of Prussia Mall West Deck garage where the Schindler Hydraulic elevator's motor has been replaced with Thyssenkrupp.

  • @seClip9 The entire elevator is being replaced due to the flood!

  • Nice elevator, and at least this was modernized by a good quality elevator company. Also was level 3 locked off?

  • Floors 3-6 were locked off.

  • Wow, I wonder why.

  • There's a keycard reader next to the panel. Probably needs a room key.

  • That's correct.

  • you need a key card to acksess thoes floors... WHEN UR IN BOSTON U SHOULD CHECK OUT THE PRUDENCAL CENTER THOES ELEVATORS SHAKE ALOT

  • @dfysu yeah but that's because they are really fast, and are too close to each other... i was waiting for one to go back down from Top of The Hub, and i stood right in front of the door. the wind pushed me back quite a bit...

  • Loading comment...
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more