Quality I wish i could afford to pay all those men to work for me. Its best to have to many for insurance reasons (meaning if something went wrong had men to work on it. But how do you make any money with all those men? I counted 7 or more.
Great job Could have got the same look with the Fresno on poles. But by them
going over the surface the way they did. It compacted the surface more. There for a more durable concrete. In cold climates the book says leave surface open.
should have covered the brick work with plastic before pour .... just kidding good lookin work ,concrete brothers bet you guys use a lot of cal in Minn.
I`ll say this for these guy`s,at least it dosen`t appear that they poured this driveway to wet or finished it to soon(wet) like 80% of the videos I`ve seen on this site.
There should be some expansion joints,along with false cuts(control joints) in this driveway.You are correct to use only floats and not steel trowel for finishing on exterior work,as steel trowels lock in the surface water which may cause spalling/peeling of the surface,especially in cold climate areas such as Minnesota.The rougher surface left behind by the mag floats will broom out if broomed as long as it is broomed in time.
BUT where are your expansion/ control joints? saw cut them booo.... unless thats what the home owner wanted. put some cedar and grove joints in there be looking good. but still good job
A hand float is ok if your trying to get a slury up to finish , but you should have at least one finishing trowel, to go over it, not two hand floats. A hand float tends to leave a thicker surface finish if that makes sense. a finishing trowel makes it cleaner. and is considered what you should use.
Thanks for your reply. I don't know if it matters that I'm in Minnesota where we have plenty of snow and ice to contend with. I wonder if maybe the not so smooth surface is safer given those hazards 5 months out of the year? I'm pretty sure that's why they 'broomed' it as a finishing touch creating small lines in the finish across the surface.
Good job
HOODYWOODRECORDS 10 months ago
Quality I wish i could afford to pay all those men to work for me. Its best to have to many for insurance reasons (meaning if something went wrong had men to work on it. But how do you make any money with all those men? I counted 7 or more.
Great job Could have got the same look with the Fresno on poles. But by them
going over the surface the way they did. It compacted the surface more. There for a more durable concrete. In cold climates the book says leave surface open.
sstonestone 1 year ago
@ derbja34, to trowel finish something that is getting a broom finish is the worst thing you can do, unless you like the the look of a peeled top.
TRJBASS 1 year ago
should have covered the brick work with plastic before pour .... just kidding good lookin work ,concrete brothers bet you guys use a lot of cal in Minn.
TRJBASS 1 year ago
nice job guys
fullsoda4me 1 year ago
Screeding would be much easier with "apearms"
Arrenization 1 year ago
If you've never done this you wouldn't understand how physically demanding it is to rub out a pad in the direct sunlight.
humbleservanttoJC 2 years ago
I`ll say this for these guy`s,at least it dosen`t appear that they poured this driveway to wet or finished it to soon(wet) like 80% of the videos I`ve seen on this site.
deuceman724 2 years ago
There should be some expansion joints,along with false cuts(control joints) in this driveway.You are correct to use only floats and not steel trowel for finishing on exterior work,as steel trowels lock in the surface water which may cause spalling/peeling of the surface,especially in cold climate areas such as Minnesota.The rougher surface left behind by the mag floats will broom out if broomed as long as it is broomed in time.
deuceman724 2 years ago
BUT where are your expansion/ control joints? saw cut them booo.... unless thats what the home owner wanted. put some cedar and grove joints in there be looking good. but still good job
jrcbfun 2 years ago
I liked the look of cut lines and that's why I opted for this.
onekgguy 2 years ago
nice job guys
jrcbfun 2 years ago
A hand float is ok if your trying to get a slury up to finish , but you should have at least one finishing trowel, to go over it, not two hand floats. A hand float tends to leave a thicker surface finish if that makes sense. a finishing trowel makes it cleaner. and is considered what you should use.
derbja34 2 years ago
Thanks for your reply. I don't know if it matters that I'm in Minnesota where we have plenty of snow and ice to contend with. I wonder if maybe the not so smooth surface is safer given those hazards 5 months out of the year? I'm pretty sure that's why they 'broomed' it as a finishing touch creating small lines in the finish across the surface.
onekgguy 2 years ago
Also shouldn't he have come back the next day to apply the seal.
derbja34 2 years ago
Why did they finish it with a hand float, doesn't make a whole lot of sense to me
derbja34 2 years ago
What should they have used?
onekgguy 2 years ago
as a finisher for the past 18 years, these guys are not very good, accually, there pretty horrible
raiderluison 3 years ago
looks very nice but way to much work. its a driveway! no need to make it glass smooth just to broom it, use a power trowel if u need it that smooth!
bosephjarrows 3 years ago
when brooming push and pull at the right time these clowns will get shrinkage cracks curing agent isnt magic
sl38003738 3 years ago
use a trowl machine better and easy why edge next to brick flat trowl us aussie do a much better job
sl38003738 3 years ago