Added: 4 years ago
From: dirboy
Views: 4,973
Sort by time | Sort by thread (beta)

Link to this comment:

Share to:

All Comments (6)

Sign In or Sign Up now to post a comment!
  • I think to be able to determine number of resources (programmer, designer, etc), firstly you need to complete load estimation (ussually in man-months) and schedule (time frame). Not in contrary.

  • this video was made based on the book made by Roger S Pressman with the title "Software Engineering". And my contribution to this project was limited to directing.

    But AFAIK, there are various different approachs that one can use. So there's no exact rule of how to do it. Don't u agree?

  • sorry i never read that book.

    resources (man-power), scope, time frame. These 3 will make equation for the quality of project. Scope and time frame normally will be defined by customer. Then if you already define (fix) resources, without finalize scope and time frame, usually you will have two options: too many or too few resources allocated in this case usually quality will be comprised such as reduce scope or extend time frame. keep project successful is difficult.

  • I see someone's a bourne fan

  • ha ha ha,is it that obvious?

    The video was made in less than two months since I re-watched the bourne supremacy and less than one month since I got the Original Soundtracks. And since I liked the music score so much...

    well, u know the rest :)

    thx 4 the comment!

  • love it,  only if you guys have English subtitle :P

  • really?

    i think i'll do that

  • right....

  • Rudi 99 ama Toro 99... Ah gila.. masih ada di sana toh..

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more